Post

Capacity | Ren-Gas takes FID on €300 million-plus e-methane plant in Finland, with DWE supplying methanation tech Nordic Ren-Gas has taken a final investment decision on its €300 million-plus e-methane plant in Tampere, Finland, and will start full-scale construction immediately, targeting production in 2029. Germany's DWE will supply the catalytic methanation unit for the plant, which pairs a 50 MW electrolyser with captured biogenic CO2. The plant will use around 40,000 tonnes a year of biogenic CO2 captured from the flue gas of the Tarastenjärvi waste-to-energy plant, producing about 190 GWh a year of renewable e-methane (CAS 74-82-8) plus up to 200 GWh a year of district heat for Tampere. The fuel will be injected into the Finnish gas grid and supplied to heavy-duty transport users in Germany via the European gas network. The European Investment Bank is lending €60 million toward the project, backed by InvestEU. It is DWE's first large-scale methanation project; its reactor follows renewable power from 30% to 100% load without gas recycle. Source: Chemical Engineering (23 November 2026)

Edited 8:36:21 AM · Nov 24, 2026
Sign in to reply and join the conversation.